SoftSHIP
- Vessels
- New search fields Send Out (mmscf), Production Capacity
- For OFFSH, two new fields to contain Number of Bow and Stern Thrusters respectively
- Add managing owner and commercial operator to default display when running an enquiry and clicking find matching vessel
- Scrubber and BWTS and Coiled type to full description report
- New Dual Fuel fields: Hydrogen Ready/Fuelled, LNG Cargo Ready/Fuelled, Ammonia Rady/Fuelled
- New Field : Has Electronic Main Engine
- Softfix
- Invoice Payment Terms to be aware of Segment, Activity, Sub Activity
- New Search Fields to have the operator search showing all fixture types with last declared period details and Estimated layden days. My fixtures (operator) search to highlight to Operator what needs to be done and what is overdue as per following
- TC’s:
- Estimated redelivery notice given (next notice type tendered)=> Estimated Redelivery field has blue text
- Estimated redelivery of vessel is within the next 7 days => Estimated Redelivery field has red text
- Some notice is due within the next 7 days => Notice Due field has red text
- TC is within next 7 days of the maximum duration => Max Period Date field has red text
- End of the minimum duration of the TC is within next 7 days => Min Period Date field has red text
- End of the maximum duration of the TC is within next 30 days => Vessel Name has a light red background
- End of the maximum duration of the TC is within 2 months => Vessel Name has a yellow background
- End of the maximum duration of the TC is within 3 months => Vessel Name has a green background
- Vessel is not delivered and cancellation date (laycan end) is in the past => Laycan field has a light red background
- Vessel is not delivered and earliest delivery (laycan start) within next 7 days => Laycan field has a yellow background
- Vessel is not yet delivered => Delivered field has yellow background
- VOY’s:
- End of Laycan within the next 7 days => Contract Type field has a yellow background
- If estimated next port time is within the next 20 days => Vessel Name field has light red text. Note: Next Port time calculated by Estimated Laden Duration, or 50 days if duration not provided.
- If estimated next port time is within the next 20 days => Estimated Laden Days field has a yellow background. Note: Next Port time calculated by Estimated Laden Duration, or 50 days if duration not provided.
- If no cargo was loaded and end of laycan is today and in the past => Contract Type field has a red background
- Old out of date fixtures, end of laycan older than 120 days => Contract Type field has a Powderblue Background
- TC’s:
- Bug Fixes
- TC Fixture Save UTC to Time type
- Document Our Value calculation - System reversal of invoiced charges followed by Manual Reversal of the Document
- Reversal and reversed invoices are not always settled
- Reversal Credit assigned wrong Addressee when Addressee against Contract has changed since the Invoice was raised
- Reports
- Broker Reports available
- Production: For a given Year/Office/Segment/Broker, report per Broker the Share of Our Value Estimate for the given year vs Estimate for Future years (Forward).
- Production vs Settled: For a given Year/Office/Segment/Broker, report per Broker the Share of Our Value Estimate for the given year including any TC/COA fixtures from the previous year vs Actual Collected (Paid Invoices)
- Statement of Account: For a given Office/Segment/Broker/Country/Currency, report per Broker (Main Broker against contract) Statement of Account (Unpaid Invoices) per Client
- Broker Reports available